testimonials
our clients say about our services
Developed in close collaboration with our partners and clients, combines industry knowledge, decades of experience, ingenuity and adaptability to deliver excellence to our clients.
I was lucky to have worked with Ciarán of V-Con LTD on two of our light-gauge steel frame projects where he set out and controlled the levels of the slabs and upstands for us to build off. Level tolerances were extremely tight at -6mm to +0mm and these were managed excellently. Ciarán was very professional and extremely helpful throughout both projects, especially with our close communications, producing as-builts and helping us maintain positional control on site.
I look forward to working with Ciarán and V-Con LTD on future projects.
Kyle Bassett
Stigmat Site Engineer
Ciarán of V-Con LTD did an excellent job at Naul, Co Dublin. I worked on this job as a Site Engineer and Construction Manager for Etex Superstructure and cannot recommend V-Con highly enough. Etex works to very tight floor tolerances (-6mm to 0mm) as the prefabricated frames sit directly on the foundation. V-Con was responsible for the setting-out, the substructure, the foundations and the groundworks required for our superstructure. This was a very challenging site due to its compact site footprint but Ciarán did a fantastic job and provided us with a slab level and slab edge all of which was well within allowable tolerances. V-Con is an extremely professional and reliable construction company with whom I would happily work with again in the future.
Edwin Svomho
Etex Site Engineer and Etex Construction Manager
To say that this 3 month modernization was a Herculean task would be an understatement. I remain convinced at this time, 2 weeks prior to occupancy that no other construction firm in the Bay Area could have handled such a task and pulled it off successfully. Alten collaborated with the district and design team on cost savings including.
Vincent Pham
Chief Executive Officer, ECOM GROUP
To say that this 3 month modernization was a Herculean task would be an understatement. I remain convinced at this time, 2 weeks prior to occupancy that no other construction firm in the Bay Area could have handled such a task and pulled it off successfully. Alten collaborated with the district and design team on cost savings including.
mark p.
Project Management
To say that this 3 month modernization was a Herculean task would be an understatement. I remain convinced at this time, 2 weeks prior to occupancy that no other construction firm in the Bay Area could have handled such a task and pulled it off successfully. Alten collaborated with the district and design team on cost savings including.
joseph S.
Project Management
To say that this 3 month modernization was a Herculean task would be an understatement. I remain convinced at this time, 2 weeks prior to occupancy that no other construction firm in the Bay Area could have handled such a task and pulled it off successfully. Alten collaborated with the district and design team on cost savings including.
Michelangelo V.
Project Management
If You Are Satisfied With The Service, Rate Us!
There is great satisfaction in knowing you’ve done your job well and served your clients’ interests. It gives us particular satisfaction when our clients take the time to acknowledge their satisfaction by providing Graviton Construction with their testimonials.

English
